Bank of America Building Generator Replacement
MAE performed Standard Penetration Test (SPT) borings within the parking area adjacent to the excavation. Geotechnical recommendations were prepared for the design and construction of the replacement generator foundation, shoring of the existing structure foundation, and backfilling of the excavations.
Greyhound Intercity Bus Terminal – JTA JRTC Phase I
The Jacksonville Transportation Authority (JTA) constructed a Regional Transportation Center adjacent to the Prime Osbourne Center in Jacksonville, Florida. The Final Concept Design document showed the Center to include a six-story administration building, bus canopies, a pedestrian bridge to the Prime Osbourne, an open-air skyway, new pavements and other improvements. In addition, an Intercity Bus […]