This project consisted of construction of a bus shelter structure, pavement and stormwater pond areas, and a traffic signal mast arm. MAE’s work included Standard Penetration Test (SPT) borings within the proposed bus shelter and mast arm areas and auger borings within the proposed pavement and pond areas. Our geotechnical report included shelter foundation design recommendations, pavement and pond considerations, and mast arm foundation recommendations. |
Menu