This project includes pavement widening of the existing off-ramps (Ramps B and D) with new guardrails constructed on the outer limits of the proposed widening areas. MAE’s field exploration included performing 11 hand auger borings to depths of 6 feet below existing ground surface within the limits of the proposed pavement widening areas. Conclusions and recommendations including soil suitability for roadway widening and roadway construction considerations will be provided in our geotechnical report.

h