JTB East Ramp to Gate Parkway Exit – A geotechnical exploration was performed by MAE to evaluate the general subsurface conditions within a proposed below-grade pipeline area, and to provide recommendations for foundation support and site preparation. In addition, a Report of Groundwater Sampling and Analysis (FDEP Dewatering Generic Permit) was prepared for the project.

The project included design and construction of a 42-inch HDPE force main to be constructed along the east alignment of Southside Boulevard continuing east along the south alignment of J. Turner Butler Boulevard to Gate Parkway for a total distance of approximately 5,200 feet.